  • Construction of desulphurization facilities of “Maritza East 2” EAD village of Kovachevo – Units 5 and 6 – 2011. Together with a consortium Idreko-Insigma.
  • Supply and installation of retractable fins / lifters / for BTM in “Maritza East 2” EAD – 2011. and 2012.
    Rehabilitation of condensation purifying system “Maritza East 2” EAD village of Kovachevo – Units 1 and 2 – 2006.
  • Rehabilitation of condensation purifying system “Maritza East 2” EAD village of Kovachevo – Units 3 and 4 – 2008.
  • Application of acid-resistant insulation based on unsaturated polyester resin reinforced with fiberglass and thermoplastic pokritie by GFK absorbers, tanks, sumps and pipelines at FGD installation / SRI / of “Maritsa Iztok” EAD 2 – Units 1 to 4 – 2007. – 2009.
  • Application of anti-corrosion coating of rubber absorbers 7 and 8 in “Maritsa Iztok” EAD village of Kovachevo 2 – annually since 2005. far
  • Production and supply of lifters and tiling drum ball mill for grinding limestone in “Maritsa Iztok” EAD village of Kovachevo 2 – 2008. – 2010.
  • Production and supply of lifters and tiling drum ball mill for grinding limestone “Contour Global Maritsa Iztok 3” AD s.Mednikarovo – 2008. – 2010.
  • Rehabilitation of Block purifying installation “Contour Global Maritsa Iztok 3” AD s.Mednikarovo – Units 1 and 2 – 2008.
  • Rehabilitation of Block purifying installation “Contour Global Maritsa Iztok 3” AD s.Mednikarovo – Units 3 and 4 – 2009.
  • Design, manufacture and installation of pressure-exhaust ventilation system for a fuel oil pumping station with automatic control and energy security in the “Contour Global Maritsa Iztok 3” AD s.Mednikarovo – 2009.
  • Fabrication and installation of abrasion coating hydrocyclon batteries for flotation of ore for the purpose of “Engineering – Dobersek” GmbH – Germany – 2005. – 2010.
  • Making chutes, exit pipes, thickeners, tanks, batteries and hydrocyclon piping and made of abrasion resistant coating for reconstruction and expansion of dressing factory “ASAREL MEDET” gr.Panagiuriste AD – 2004. – 2008.
  • Rubber coating of the tank with acid-rubber coating for “KCM” JSC Plovdiv – 2007 – 2010.
  • Production of technical rubber products for “Vulcan” AD Dimitrovgrad – 2007 – 2010.
  • Subscription performing repair services rubber coating of facilities of chemical equipment in TPP “Varna” EAD – 2008 – 2010.
  • Repair clean gas duct and restore its anticorrosion coating at SRI “Maritza East 2” EAD – Units 7 and 8 – 2007.
  • Repair of corrosion-resistant rubber coating on the absorbers SRI “Maritza East 2” EAD – Units 7 and 8 – 2007.
  • Repair of anti-erosion coating PP of supporting structure of spraying nozzles of FGD absorbers “Maritza East 2” EAD – Units 7 and 8 – 2007.
  • Repair clean gas duct and restore its anticorrosion coating at SRI “Maritza East 2” EAD – Units 7 and 8 – 2008.
  • Restore corrosion of rubber absorber FGD “Maritza East 2” EAD – unit 7 – 2008.
  • Restore corrosion of rubber absorber FGD “Maritza East 2” EAD – Block 8 – 2008.
  • Repair of anti-erosion coating PP of supporting structure of spraying nozzles of FGD absorber “Maritza East 2” EAD – Block 8 – 2008.
  • Implementation of acid isolation based on vinylester resin components of SRI – absorbers, tanks, concrete ducts and shafts on the project – “Rehabilitation of Units 1-4 of” Maritza East 2 “EAD – 2007.
  • Supply and installation of retractable fins / lifters / for BTM in “Maritza East 2” EAD – 2009.
  • Supply of cleaning supplies / cpl. / For GTL in “Maritza East 2” EAD – 2009.
  • Complete replacement of lifter bars / lifters / a tumble-ball mills / BTM / in “Maritza East 2” EAD – 2009.
  • Delivery of spare parts for rotary-ball mills / BTM / in “Maritza East 2” EAD – 2009.
  • Replacement of 5pcs. worn joints in ducts, repair of sealing strips bypass valves and repair of separator systems “Maritza East 2” EAD – 2009.
  • Application of corrosion of ducts after ID fan of KA-11 in “Maritza East 2” EAD – 2009.
  • Restore corrosion and gum rubber coating equipment SRI “Maritza East 2” EAD – 2009. – Units 1 and 4
  • Delivery of spare parts for rotary-ball mills / BTM / Hammer crusher for limestone and lime Reclaimer “FAM” in “Maritza East 2” EAD – 2010.
  • Delivery of spare parts for hydrocyclon KREBS systems for limestone and gypsum slurry in “Maritza East 2” EAD – 2010.
  • Restore corrosion and antiabrazivno rubber facilities SRI “Maritza East 2” EAD units 7 and 8 – 2010.
  • Replacement of sections of GRP pipes for limestone slurry FGD “Maritza East 2” EAD Units 1 and 4 – 2010.
  • Futirovka of drive drums in “Maritza East 2” EAD – 2010.
  • Supply and installation of cladding plates in BTM CS SRI “Maritza East 2” EAD – Units 1 and 4 – 2010.
  • Maintenance and emergency repairs to facilities and equipment for FGD gypsum / IOG / in “Maritza East 2” EAD – Units 5 and 8 – 2010.
  • Delivery of beams visokoiznosoustoychivi for “Maritza Iztok” EAD – 2008.
  • Supply of rubber rings GP1017 for “Maritza Iztok” EAD – 2009.
  • Supply of rubber goods for “Maritza Iztok” EAD – 2008.
  • Lining of the drums for RTB by hot vulcanization for “Maritza Iztok” EAD – 2007 – 2009.
  • Supply of coating materials and coating by hot vulcanization for 7 pieces buckets SRS2000 in “Maritsa Iztok” EAD – 2008.
  • Supply of profile vulcanization materials recovery tape V2250 St3150 for “Maritza Iztok” EAD – 2010.
  • Supply of rubber dielectric filler in making cable joints for “Maritza Iztok” EAD – 2010.
  • Supply of rubber rings for “Maritza Iztok” EAD – 2010.
  • Tensioning drums lining the F500 for Rs1200M in “Maritsa Iztok” EAD – 2010.
  • Supply of rubber pad for small and large concrete sleepers St.-4 for “Maritza Iztok” EAD – 2010.
  • Lining of the shaft “Sofia Med” – 2007.
  • Sandblasting and application of ACP on the inner surface of the container table in “Maritza East 2” EAD – 2007.
  • Sandblasting, rubber and application of corrosion on pipes, elbows, tees and transitions “Energoremont Radnevo” Ltd. – 2008.
  • Sandblasting and laying in the ACP / filters in “VRZ Vola” AD – 2007.
  • Lining of the drums for “VRZ Vola” AD – 2007.
  • Rubber-metal constructions with durable rubber coating for “Engineering Dobersek” GmbH – 2008 – 2010.
  • Rubber-metal constructions with durable rubber coating for DPSV SPMD region Plovdiv – 2007 – 2008.
  • Rubber-metal constructions with durable rubber coating for FLSmidth UK – 2007 – 2008.
  • Lining of the drums for “ASAREL MEDET” AD – 2007 – 2008.
  • Rubber-metal constructions with durable rubber coating for “Elatsite Med” – 2007 – 2009.
  • Lining of the rollers and drums for “Sofia Med” – 2007 – 2008.
  • Supply kit gumirovka for BTM lime in “Enel Maritsa Iztok 3” AD – 2010.
  • Replacing the rubber coating of the tank gypsum suspension in goyim “Contour Global Maritsa Iztok 3” AD – 2010.
  • Delivery, removal and installation of rubber for BTM lime in “Contour Global Maritsa Iztok 3” AD 2010.
  • Supply kit rubber lining for BTM in “Contour Global Maritsa Iztok 3” AD – 2009.
  • Emergency repair and maintenance of rubber Hz for BC2 in “Contour Global Maritsa Iztok 3” AD 2009.
  • Disassembly, cleaning and application of new rubber and installation of power system pipe BTM1 in “Contour Global Maritsa Iztok 3” AD
  • Recovery of ACC Reactor – settling in “Contour Global Maritsa Iztok 3” AD 2009.
  • Rehabilitation of kondenzoochistvashti systems “ENEMONA” AD – 2008 – 2010.
  • Lining of the drums and rollers “Bobov dol” – 2007 – 2010.
  • Production of technical rubber products, rubber sheets, profiles of NPP “Kozloduy” – 2007.
  • Facing Tensioning drums excavators Rs 1,200 m in diameter Ø 500 casing length L = 2100 mm and thickness of the lining δ = 15 mm – “Mini Maritsa Iztok” EAD – 12.10.2011 AD – 2010.
  • Supply and installation of cladding plates SRI “Maritza East 2” EAD – Units 1 and 4 – 2010.
  • Maintenance and emergency repairs to facilities and equipment for FGD gypsum / IOG / in “Maritza East 2” EAD – Units 5 and 8 – 2010.
  • Delivery of high wear resistant beams of “Maritsa Iztok” EAD – 2008.
  • Supply of rubber rings GP1017 for “Maritza Iztok” EAD – 2009.
  • Lining of the reversible drum CTM and GTL diameter up to Ø 1250 and thickness of the lining δ = 15 mm by hot vulcanization – “Mini Maritsa Iztok” EAD – 12.10.2011
  • Delivery of vulcanization material strip with steel cords – “Mini Maritsa Iztok” EAD – 15.08.2011
  • Delivery of wiper rubber – “Mini Maritsa Iztok” EAD – 05.04.2012
  • Delivery of vulcanization material strip with steel cords – “Mini Maritsa Iztok” EAD – 12.06.2012
  • Lining of the drive and reversible drum thickness of the liner 15 mm by hot vulcanization – “Mini Maritsa Iztok” EAD – 21.09.2012
  • Lining of the drive and reversible drum thick coating of 20 to 30 mm by hot vulcanization – “Mini Maritsa Iztok” EAD – 21.09.2012
  • Routine maintenance of lifts and lifting equipment at the plant “ContourGlobal Maritsa Iztok 3” AD – 01.11.2011
  • Supply kit gumirovka for BTM 00NTK02/22/42 – “ContourGlobal Maritsa Iztok 3” AD – 01.11.2011
  • Repair of corrosion-resistant rubber coating of the absorber 12 – “ContourGlobal Maritsa Iztok 3” AD – 11.06.2012
  • Repair of corrosion-resistant rubber coating of the absorber 34 – “ContourGlobal Maritsa Iztok 3” AD – 04.09.2012
  • Delivery of GRP components and replacement of sections of limestone slurry pipelines – “Maritza East 2” EAD – 20.01.2011
  • Delivery of spare parts for mills and crushers for limestone – “Maritza East 2” EAD – 20.01.2011
  • Lining of the drums – “Maritza East 2” EAD – 18.05.2011
  • Supply of tires, rope and rubber gasket-profile microporous “Maritza East 2” EAD – 27.06.2011
  • Repair and maintenance of corrosion and gum bands of facilities and pipelines in the workshop SRI bl.1-4 “Maritza East 2” EAD – 26.07.2011
  • Laying of durable elastic coating, “Maritza East 2” EAD – 25.01.2012
  • Delivery of spare parts for BTM, hammer crusher, limestone Reclaimer and hydrodynamic coupling FAM – “Maritza East 2” EAD – 25.01.2013
  • Delivery of materials and replacement of sections of pipelines limestone slurry in FGD plant bl.1-4 – “Maritza East 2” EAD – 07.03.2012
  • Laying rubber on drums, “Maritza East 2” EAD – 26.04.2012
  • Application of abrasion resistant, fire-resistant and shockproof rubber protective coating apparatus pepelosmivni Doo Doo 700 and 500 – “Maritza East 2” EAD – 27.06.2012
  • Repair and restoration of 120 m ² tarry corrosion – “Maritza East 2” EAD – 30.07.2012
  • Delivery of materials for hot vulcanization vulcanization, “Maritza East 2” EAD – 28.09.2012
  • Repair of 60 m ² corrosion of equipment in the workshop SRI bl.1-4 – “Maritza East 2” EAD – 21/11/2012
  • Production and protection abrasion rubber mixtures of hydrocyclones and drums of different diameters, Butare, Butare beneath dvoni, flotation waste chute, chute Power flotation details for ball mills, pipe connections Sands boxes hydrocyclones, screw dischargers ore scrap , facing plates with a thickness of 10 to 50mm – ASAREL MEDET AD – 2009 – 2012
  • Manufacturing of rubber diaphragms for filterpress Laroks – KCM – 2009 – 2012.