Rubber compound production
Our own formulations and a semi-automated mixing line with a capacity of 1,200 t per year.
Since 2003 · Rubber compounds, rubber lining and corrosion protection
In-house rubber compounding, shop and on-site rubber lining, and conveyor belt service for power plants, mines and chemical plants in Bulgaria and across Europe.
23+
years of experience
Founded 2003 · Dimitrovgrad
1,200 t
rubber compounds per year
In-house mixing and calendering
1,400 mm
calender working width
Sheets for large structures
350+
completed industrial projects
In Bulgaria and across Europe
What we do
From the compound to the finished component: every step is engineered, produced and quality-controlled under one roof in Dimitrovgrad - and delivered on site by our own crews.
Our own formulations and a semi-automated mixing line with a capacity of 1,200 t per year.
Rubber lagging of conveyor pulleys and rollers - with grooving or with ceramic lagging.
Chemical- and abrasion-resistant rubber lining of tanks, absorbers, pipelines and vessels - in the shop or on site.
Rubber lining and corrosion protection of absorbers, flue gas ducts and tanks in FGD plants.
Application of anti-corrosion, fire-resistant and chemical-resistant coatings based on special paints, varnishes and resins.
Splicing, repair and maintenance of rubber conveyor belts for open-pit and underground mines.
Sectors
More than two decades of work in the most demanding environments: abrasive slurries, hot acids, flue gases and continuous operation.
Portfolio
Drag the slider to compare the surface before and after our work.
Before
After
New rubber lining for the discharge trunnion of an MMS 7.0×2.30 autogenous mill.
Before
After
Fabrication, rubber lining and painting of hydrocyclone clusters, delivered on shipping frames.
Before
After
Application and maintenance of the anti-corrosion rubber lining of absorbers 7 and 8 - every year since 2005.
Why ZKI Volta
Recipe
We mix and calender our own rubber, so formulation, lead time and cost stay under our control.
Control
Hardness, rheometry, physical and mechanical properties and abrasion - for every batch.
On site
Mobile lining and blasting crews work during planned outages and in operating plants.
Guarantee
An implemented quality management system and full documentation for every project.
A single responsible partner for the whole chain - from the compound formulation to the last metre of lining on your site.
Start a project
Our engineers reply within 24 hours.
We have received your enquiry. Our engineers will contact you within 24 hours on working days.
Your message has been sent. We will contact you within 24 hours on working days.