EU projects

Interreg VI-A IPA Bulgaria–Türkiye Programme 2021–2027, CCI 2021TC16IPCB005: project CBMSC-ZVA Initiative

Rubber compound production (sample photo)

Project: CrossBorder MetalSustain Connect – ZKI – VOLTA & Armosan Initiative

Acronym: CBMSC-ZVA Initiative

Project ID: BGTR0300141

Grant agreement: RD-02-29-846/01.08.2025

Project duration: 24 months

Lead partner: ZKI-VOLTA Ltd. (Bulgaria)

Project partner 2: Armosan Sıcak Çekme Dikişsiz Boru San. ve Tic. A.Ş (Türkiye)

Programme: Interreg VI-A IPA Bulgaria–Türkiye Programme 2021–2027, reference number CCI 2021TC16IPCB005

Budget: EUR 339,950.67 (EU IPA funds: EUR 288,958.06; national co-financing: EUR 50,992.61)

Overall objective: Within the development of circular bio-based business models, solutions and products, the overall objective of the project is to catalyse the transition to a circular and resource-efficient economy in the Bulgaria–Türkiye cross-border region, to transform the companies’ production in a way suited to a climate-neutral economy, and to reduce waste throughout the product life cycle.

Specific objectives: SO1. Active uptake of circular economy principles and related production practices through the management of pilot actions jointly developed and implemented within the CBMSC-ZVA Initiative, and greater visibility of the impact of the CBMSC-ZVA Initiative in the cross-border area; SO2. Introduction of circular and resource-efficient solutions in the production processes of both companies through investment in equipment.

Activities:

Work package 1: Preparation and management

Activity 1.1. Project management

Activity 1.2. Partner meetings

Activity 1.3. Supply of IT hardware and software (computers) for project management

Activity 1.4. Production of 1 information board and stickers in Bulgaria

Activity 1.5. Production of 1 information board in Türkiye

Work package 2: Investment in equipment

Activity 2.1. Manufacture, supply and installation of a cooling system for a rubber processing machine

Activity 2.2. Supply of an electric forklift for in-plant operations

Activity 2.3. Hiring of 1 employee (1 forklift operator) for 18 months to carry out project activities

Activity 2.4. Supply and installation of equipment in Türkiye

Expected results:

A successfully developed solution that is adopted or scaled up beyond the project, contributing to the transition to a circular and resource-efficient economy. The solution refers to tangible results and innovations developed within the project financed by the Programme – practical interventions, technologies and approaches aimed at promoting the circular economy and resource efficiency. The proposed solution will extend the implemented approaches and investments from local to regional and cross-border level in order to promote a resource-efficient and circular economy.

The results of the activities planned in Work package 2 are investments in tangible assets and the creation of jobs within the project. The installation of a zero-waste cooling system, the supply of an electric forklift and the inclusion of energy- and resource-efficient industrial motors will become an integral part of the production processes and operation of the two participating companies on both sides of the border. These investments aim to improve production processes, reduce energy consumption and minimise environmental impact.

“This publication is (co-)funded by the European Union. Its contents are the sole responsibility of ZKI-VOLTA Ltd. and do not necessarily reflect the views of the European Union or of the Managing Authority and the National Authority of the Programme.”