Completed project

Sandblasting, priming and rubber lining of the absorber 2 floor at AES TPP 1

Sandblasting, priming and a new rubber lining for the floor of absorber 2.

Client and site
AES TPP 1

The task

A new rubber lining for the floor of absorber 2.

The solution

The floor was sandblasted, primed and rubber lined.

Gallery

Start a project

Have a similar project? Request a quote.

Our engineers reply within 24 hours.

  • Reply within 24 hours
  • In-house lab for every batch
  • On-site crews in Bulgaria and Europe
  • Reply in 24h
  • In-house lab
  • On-site crews

PDF, DWG, DXF, JPG, PNG, ZIP · up to 5 files, 25 MB in total

Detailed quote request
Call us
ZKI VOLTA
Request a quote